Client

GB Hotel Group

Sector

Hospitality (Marriott)

Location

Weston, Florida

Duration

18 Months

Project Value

$2.9M

TownePlace Suites Marriot Weston

Full Property PIP Renovation

Miliani Construction executed a comprehensive $2.9 million multi-phase PIP renovation at TownePlace Suites by Marriott in Weston, Florida. The project encompassed a full transformation of 95 guest rooms, kitchens, bathrooms, and all public amenities.

Delivered over an 18-month timeline across multiple high seasons, this project highlights Miliani’s ability to manage large-scale hospitality renovations while maintaining uninterrupted hotel operations and guest satisfaction.

Extended-stay kitchenette with dish storage, two-burner cooktop and stainless appliances in a hotel suite
Breakfast servery and seating at a Weston area hotel, with new tile flooring, buffet millwork and pendant lighting

Project Results

  • 95 guest rooms fully renovated
  • Full hotel transformation including lobby, gym, and breakfast areas
  • Uninterrupted operations across two high seasons
  • Successful ADA compliance integration across all spaces
  • Enhanced property value and guest satisfaction

Multi-Phase Execution Strategy in Active Hospitality Environment

Miliani implemented a structured multi-phase renovation plan designed to minimize disruption and maintain operational continuity. Each phase was strategically sequenced to ensure that key guest areas remained accessible while construction progressed.

This approach allowed the hotel to operate seamlessly across extended timelines, including multiple peak occupancy periods.

Mirror-lined hotel gym in Weston with treadmills, dumbbell rack, bench, sanitizer and exit door

Large-Scale Renovation Without Operational Disruptiont

The project required careful coordination across multiple trades, including electrical, plumbing, and finish installations. Work was executed in controlled zones with continuous alignment between construction teams and hotel management.

Technical Scope: Kitchens, Bathrooms & Infrastructure

The renovation included full upgrades to kitchens and bathrooms, with new cabinetry, appliance installations, plumbing systems, and electrical configurations to meet updated Marriott brand standards.

Additional scope included lobby reconstruction, fitness center upgrades, and complete FF&E installation across guest rooms and shared spaces.

Hotel fitness area with new striped carpet, treadmills, free weights and towel storage at a Weston hotel

Victoria Briscoe

Executive Director of Hospitality at GB Hotel Group.

“Miliani Construction consistently demonstrated professionalism, reliability, and a high standard of craftsmanship while maintaining smooth hotel operations throughout a complex multi-phase renovation.”

Schedule Consultation